HOME RENOVATION COSTS IN WINNIPEG

Starting ranges from our own instant estimator for kitchens, bathrooms and basements, what moves them, and how to get a written quote for your project.

Updated · Prices from October 2026

Starting ranges in our instant estimator, by service
ServiceStarting range by sizeTypical timeline
Bathroom renovation$16,000–$36,000 (up to 50 sq ft through 150+ sq ft)2–3 weeks
Basement development$25,000–$150,000 (up to 500 sq ft through 1,500 sq ft)4–8 weeks
Kitchen renovation$40,000–$190,000 (up to 100 sq ft through over 200 sq ft)4–6 weeks once cabinets are on site

Each service links to its full cost guide. Ranges cover the size of the space. Options such as a new shower, cabinets, countertops, flooring or an egress window each have their own range in the estimator. Your written quote after the free on-site visit is the final price.

What changes the cost of a renovation

The same few things move the price on almost every job. These are what we look at during the on-site visit.

01

The size of the space

Size sets the starting range in our estimator. A bathroom up to 50 sq ft starts at $16,000; a basement up to 500 sq ft starts at $25,000. More area means more material and more labour hours.

02

Layout changes

Keeping plumbing, gas lines and walls where they are keeps a job simpler. Moving a sink or toilet, or taking out a wall, brings in more trades, and a load-bearing wall needs a beam and the right permits.

03

Finish level

Stock or custom cabinets, laminate or quartz, a standard vanity or a custom one: finishes are where two similar rooms end up at different prices. The estimator shows the range it uses for each choice.

04

What is behind the walls

Older homes can hide old wiring, tired plumbing or water damage that only shows up at demolition. Ask at the on-site visit how anything found behind the walls would be handled and priced.

05

Permits and code items

Finishing a basement or adding a bedroom needs a building permit, kitchens and bathrooms often do, and electrical and plumbing work have permits of their own. Code items, such as a bedroom egress window or a backwater valve on new below-grade plumbing, are part of the price.

06

Changes once work starts

Swapping a tile, a fixture or the layout after materials are ordered changes the cost. Settling your choices before you sign keeps surprises down; ask for any change to be priced in writing before it is made.

What does $100,000 get you in a Winnipeg renovation?

In our instant estimator, $100,000 falls inside the medium kitchen range (100–200 sq ft, $80,000–$139,999) and at the top of the medium basement range (501–1,000 sq ft, $45,000–$100,000). It is well above the bathroom size ranges, which top out at $36,000 before a new tub, shower or other options.

Where a budget like this lands depends on how much of the house is being opened up. A medium kitchen with semi-custom cabinets and quartz counters is a different job from a basement with a new bathroom and an egress window, even at a similar price. Our guide to choosing between a full renovation and partial upgrades can help you decide how far to take it.

Is there a renovation cost per square foot in Winnipeg?

We don’t price renovations by the square foot, because cost isn’t spread evenly across a room. A small bathroom packs plumbing, tile and fixtures into very little floor, while a basement spreads framing and drywall over a large open area. That’s why our estimator starts from size ranges, then factors in your choices.

Compare the two smallest tiers: a bathroom up to 50 sq ft starts at $16,000–$20,000, and a basement up to 500 sq ft starts at $25,000–$80,000. Ten times the floor area doesn’t mean ten times the price.

What is usually the most expensive part of a renovation?

The size and scope of the job, more than any single finish. In our estimator, a new tub-and-shower combo ($12,000–$18,000) or a new shower ($10,000–$15,000) is the largest bathroom option, and in kitchens the size range moves the price far more than any cabinet or countertop choice. Moving plumbing or walls adds more.

Work hidden in walls and floors is the other big variable, especially in older homes: wiring, drains and structure that need updating once they are exposed. The estimator can’t see those, so they are priced after the on-site visit. If you own an older house, our guide to renovating a character home in Winnipeg covers what to expect.

How much contingency should you keep for a renovation?

Many homeowners keep a contingency on top of the quoted price, and it makes the most sense in older homes or on jobs that open up walls and floors. We don’t publish a set percentage, because the right cushion depends on the house. Ask us at the on-site visit what we would plan for in yours.

If something unexpected turns up once work starts, ask for the fix to be priced in writing before that work goes ahead, so you decide with the number in front of you. Changes you choose part-way through also change the cost, as the federal Office of Consumer Affairs renovation guide points out, so settling finishes before you sign helps keep the budget steady.

For a step-by-step way to set your budget, see our home renovation planning guide.

What about whole-home, additions and commercial work?

Whole-home renovations, home additions and commercial projects aren’t in our instant estimator, because their scope varies too much to price from a few questions. They are priced after a free on-site visit, with a written quote that sets out what is included before any work begins.

  • Whole-home renovations: most run 8–16 weeks, depending on the size of the house and how much of it is being renovated.
  • Home additions: many straightforward additions take roughly 8–16 weeks once permits and materials are ready.
  • Commercial renovations: offices, retail stores, restaurants, cafés and bars, hotels, and medical, dental and physio clinics, with after-hours or weekend scheduling and weekly progress updates.

To get a number for any of these, book a free on-site visit. For business budgets, our guide to the biggest cost factors in commercial renovation explains what moves the price.

How do homeowners pay for a renovation?

Many homeowners talk to their own bank or credit union, and one option many consider is a home equity line of credit. Whatever you choose, get your written quote first, so you know the amount you actually need to borrow.

The Financial Consumer Agency of Canada explains that a home equity line of credit is secured by your home, that you may borrow up to 65% of your home’s value, and that if you don’t pay it back you could lose your home. It is worth reading before you sign anything.

Two federal programs are closed: the Canada Greener Homes Grant and the Canada Greener Homes Loan no longer accept new applications. For what is open now, see our guides to Manitoba renovation tax credits and rebates and home renovation financing in Canada.

See a starting price for your kitchen, bathroom or basement

Pick a service, then answer a few quick questions to see the starting range our estimator uses for your project. It’s free and there’s no obligation.

Cost questions, answered

It depends on the room. On our jobs, a typical bathroom takes two to three weeks, a kitchen four to six weeks once the cabinets are on site, and a basement four to eight weeks. Whole-home renovations usually run eight to sixteen weeks, and many straightforward additions take about the same once permits and materials are ready.

Get a free instant quote

Answer a few quick questions for a starting price range, then book a free on-site visit for your written quote.