Full Home Renovation Contractor in Winnipeg

WHOLE HOME RENOVATIONS IN WINNIPEG

We plan and build whole home renovations in Winnipeg and nearby communities: layout, kitchen, bathrooms, flooring, paint, wiring and plumbing, under one schedule and one written scope. Most take eight to sixteen weeks.

  • Free on-site visit
  • Room-by-room written scope
  • Weekly progress updates
  1. 1Your project
  2. 2Pick a time

Book Your Free On-Site Visit

Takes about a minute. Next, you’ll pick a time for your free on-site visit.

Is the project in Winnipeg or a nearby community (within about an hour)?
Type of renovationPick all that apply

No obligation, and we never sell your details. See our Privacy Policy.

BRIDGING DREAMS INTO REALITY ✦
WINNIPEG MANITOBA ✦
OVER 60 YEARS OF COMBINED EXPERIENCE ✦
MORE THAN 100 PROJECTS ✦
QUALITY WORK, NO SHORTCUTS ✦
BRIDGING DREAMS INTO REALITY ✦
WINNIPEG MANITOBA ✦
OVER 60 YEARS OF COMBINED EXPERIENCE ✦
MORE THAN 100 PROJECTS ✦
QUALITY WORK, NO SHORTCUTS ✦
60+
Years of combined experience
100+
Projects completed across Winnipeg
8–16
Weeks for most whole home renovations
1day
Reply within one business day
Modern two-storey house at dusk with dark wood cladding and large glass walls
One Plan, Start to Finish

One schedule and one scope, instead of juggling five contractors yourself.

Everything gets touched, so everything has to match

A whole home renovation is the one job where the details really have to agree with each other. The floor in the hallway has to meet the kitchen right. The trim in the living room has to match the bedrooms. When five different contractors handle five different rooms, that’s where things go sideways.

We take on the whole house so that doesn’t happen: one schedule, one set of materials, and trades coordinated so each one knows what the next needs. The same goes for interior renovations with no structural change, such as new flooring, doors, trim and paint throughout.

You get a progress update every week, so you always know what’s happening and what’s coming up.

Whole home projects can run in stages so you can stay in the house where possible. If you’d rather we go all at once and get out faster, we can plan it that way too — it’s your call, and we’ll be straight with you about what each option costs you in time.

  • Open-Concept Layouts
  • Kitchens & Baths
  • Flooring Throughout
  • Paint & Trim
CHECK AVAILABLE DATES

What does a whole home renovation include?

A whole home renovation usually covers the layout, the kitchen, every bathroom, flooring throughout, paint, trim and doors, plus the electrical and plumbing the new plan needs. Your list may be shorter or longer. We write the scope room by room after the on-site visit, so you can see exactly what is in it before work begins.

01

Layout & Walls

Opening up living areas, moving or removing non-structural walls, and framing new rooms where you need them.

02

Kitchen

Full kitchen build — cabinets, counters, backsplash, appliance fit, plus the plumbing and electrical behind it all.

03

Bathrooms

Every bath in the house brought up to the same standard, with proper waterproofing under the tile.

04

Flooring

One continuous flooring plan across the main level so rooms flow instead of stopping at every doorway.

05

Paint, Trim & Doors

New baseboards, casings, interior doors, and a full repaint so the finish is consistent room to room.

06

Electrical & Plumbing

Updated wiring, lighting, and plumbing runs where the old ones aren’t up to what the new layout needs.

Which kind of whole house renovation fits your home?

Whole home work tends to follow one of a few patterns: a complete home renovation of every room, a main-floor renovation, an interior renovation of selected rooms, or bringing an older house up to date while the walls are open. The right one depends on what the house needs and how long you can live with work underway.

01

Complete home renovation

Every room planned together and built in stages or all at once, so floors, trim and finishes match from the front door to the back bedroom.

02

Main-floor & open-concept

Opening the kitchen, dining and living rooms into one space. A load-bearing wall needs a beam and a building permit, and both are planned before demolition: see removing a load-bearing wall in Winnipeg.

03

Interior renovation

Selected rooms brought to one standard: living room, bedrooms, laundry room or mudroom, with new flooring, lighting, doors and paint.

04

Older home updates

With the walls open on an older house, it’s the right moment to replace outdated wiring and plumbing, add insulation, and have suspect materials tested for asbestos.

05

Renovating before you move in

Just bought a house? Work goes faster through empty rooms, so renovating before move-in can shorten the job. We plan the scope around your possession date.

06

Staged renovation while you live there

Work done in sections, with a kitchen and a bathroom kept usable as long as possible, so you can stay in the house through most of the project.

Which permits does a whole home renovation need in Winnipeg?

Usually several. Creating a new bedroom requires a building permit, and the City of Winnipeg says kitchens, bathrooms, open-concept layouts and new or larger exterior openings may need one. Electrical and plumbing work may need trade permits, and some structural changes need an engineer’s sealed drawing. We coordinate the full set with the City or your local municipality.

Outside Winnipeg? See who issues permits in each community we serve.

Sources: City of Winnipeg: Home renovations (verified 2026-10-13);

City of Winnipeg: Information Bulletin 2026-007-B, Building permit requirements for housing (verified 2026-10-13);

City of Winnipeg: Information Bulletin 2026-013-B/S, Engineering requirements for housing (verified 2026-10-13);

City of Winnipeg: Housing inspections (verified 2026-10-13);

Health Canada: Health risks of asbestos (verified 2026-10-13)

01

Building permit triggers

Since February 2026, the Winnipeg Building By-law requires a building permit to create a new bedroom or finish an undeveloped level. The City’s examples of renovations that may need one include kitchens, bathrooms, open-concept living spaces, and new or larger exterior door and window openings. Cosmetic changes do not.

02

Insulation and siding changes

Under amendments adopted in February 2026, the Winnipeg Building By-law requires a building permit to alter the building envelope: for example, adding rigid foam insulation to a wall assembly, or replacing stucco with vinyl siding.

03

Structural work and engineering

Where a structural element goes beyond Part 9 of the Manitoba Building Code, the City requires a sealed drawing from a professional engineer registered in Manitoba and a sealed Professional Designer’s Certificate for Housing.

04

Electrical and plumbing permits

Rewiring, new circuits, moved fixtures and new drain lines are trade work. The City notes that many projects need electrical and plumbing permits separate from the building permit.

05

Inspections at each stage

Rough-in inspections happen before framing, HVAC, electrical or plumbing work under a permit is covered, and a final inspection closes each permit. The City expects a complete set of plans on site throughout construction.

06

Asbestos in older homes

Health Canada says that before 1990, asbestos was mainly used for insulating buildings and homes, and lists plaster, drywall, floor tiles and pipe insulation among older materials that may contain it. It advises having a professional test for asbestos before renovating, and leaving vermiculite insulation undisturbed.

From First Visit to Final Clean

Four steps, and you’ll know where the project stands at every one of them.

01

On-Site Visit

We come to the house, look at every room with you, and listen to what’s working and what isn’t. Bring your wish list — no idea is too big to talk about.

02

Plan & Quote

You get a written scope, room by room, with what’s included and what it costs. Nothing starts until you’ve read it and you’re happy with it.

03

Build

Demo, framing, mechanical, then finishes — in that order, on a schedule you can see. We keep the site clean, send a progress update every week, and tell you before anything noisy or disruptive happens.

04

Walkthrough & Handover

We walk the whole house with you and fix anything on your list before we call it done. Then we clean up and get out of your way.

Whole home renovations are priced in a free written quote after an on-site visit, not from a few online questions, because no two houses need the same scope. Our Winnipeg cost guide shows the starting ranges for kitchens, bathrooms and basements, and what moves the price.

RENOVATION COSTS IN WINNIPEG

What Our Clients Say

In their own words: what it’s like working with Bridgeland Builders.

READ OUR REVIEWS ON GOOGLE
“We had our whole main floor redone and honestly expected it to be a nightmare. It wasn’t. The crew showed up when they said they would, the site was swept every single night, and when we changed our minds about the flooring halfway through they just sorted it out. The house finally feels like ours.”
Sandra K.

Homeowner, Whole Home Renovation

Let’s talk about your whole home renovation

Send us the details and we’ll come to the property, look at the space with you, and give you a straight answer on what it takes.

  • Free, no-obligation visit

    We come out, measure up, and talk it through. You decide after that.

  • Reply within one business day

    Our team gets back to you by phone, text, or email — your pick.

  • Clear written quote

    One price, itemised, with nothing hiding in the small print.

  • Your details stay private

    We use them to get back to you about your project, and we never sell them.

  • Rather just call?

    431-866-5644 — Winnipeg, Manitoba

  • Have photos or a floor plan?

    After you send the form, email them to info@bridgelandbuilders.com with your name.

Get a Free Instant Price Guide

Our instant price guide gives starting ranges for kitchen, bathroom and basement renovations. Your whole home renovation is priced in the free written quote that follows an on-site visit.

Frequently Asked Questions

The things people ask us most before booking a whole home renovation.

MORE RENOVATION FAQS

Most run eight to sixteen weeks, depending on the size of the house and how much of it is being renovated. You get a schedule with your written quote, and if something shifts we tell you the same week in your progress update, not at the end of the job.

Still thinking it over?

Book a free on-site visit and we’ll follow up with a free written quote for your whole home renovation. There’s no obligation to go ahead.