Hi! I’m Emma, Bridgeland’s virtual assistant.
Winnipeg, Manitoba431-866-5644
Office Fit-Ups & Tenant Improvements

OFFICE RENOVATIONS IN WINNIPEG

We renovate offices, from a single meeting room to a full tenant fit-up, around your lease dates and your team’s working hours. Noisy work can be scheduled for evenings and weekends.

  • Free site visit & written quote
  • After-hours & weekend scheduling
  • Weekly progress updates
  1. 1Your project
  2. 2Pick a time

Book Your Free Consultation

Takes about a minute. Next, you’ll pick a time for your free on-site visit.

Is the project in Winnipeg or a nearby community (within about an hour)?
Type of renovationPick all that apply

No obligation, and we never sell your details. See our Privacy Policy.

BRIDGING DREAMS INTO REALITY ✦
WINNIPEG MANITOBA ✦
OVER 60 YEARS OF COMBINED EXPERIENCE ✦
MORE THAN 100 PROJECTS ✦
QUALITY WORK, NO SHORTCUTS ✦
BRIDGING DREAMS INTO REALITY ✦
WINNIPEG MANITOBA ✦
OVER 60 YEARS OF COMBINED EXPERIENCE ✦
MORE THAN 100 PROJECTS ✦
QUALITY WORK, NO SHORTCUTS ✦
60+
Years of combined experience
100+
Projects completed
1×
Progress update every week
1day
Reply within one business day
Open office with glass-walled rooms, a dark kitchenette, and teal bench seating

Lease Dates First

The schedule starts from your move-in date and works backwards.

What does an office renovation involve?

An office renovation reworks a workspace around how your team works now: private offices, meeting rooms, open work areas, a staff kitchen, washrooms, lighting, power and data. In a leased unit it’s usually called a fit-up or tenant improvement, and work regulated by the building code needs a City of Winnipeg building permit.

The lease drives the schedule. Your move-in date, any free-rent period and, in many leases, the landlord’s approval of your plans all set how much time there is to build. Bring the lease to the site visit and we’ll plan from those dates.

If your team stays in the space during the work, we split it into phases and schedule the loud work, such as demolition and cutting, for evenings and weekends where the City’s noise rules allow. You get a progress update every week, so you can tell your staff what’s happening next.

Already have drawings from an architect or interior designer? We build to supplied drawings. If you don’t, start with the site visit: we’ll talk through the layout and tell you whether the City is likely to ask for professional drawings for your scope.

  • Tenant Fit-Ups
  • Meeting Rooms & Offices
  • Partitions & Ceilings
  • Lighting, Power & Data
CHECK AVAILABLE DATES

What an Office Renovation Covers

The full fit-up. Only need part of it, like new finishes or two more meeting rooms? Say so and we’ll scope just that.

01

Site Visit & Scope

Walking the space with you and your lease, counting desks and rooms, and writing a scope you can check against your plans.

02

Demolition & Partitions

Taking out old walls and building new office partitions, doors and demising walls, with fire separations kept intact.

03

Ceilings & Lighting

T-bar or drywall ceilings, with lighting and controls laid out for the new desks and meeting tables rather than the old floor plan.

04

Power, Data & HVAC

Outlets and data runs where people actually sit, plus HVAC changes so new rooms aren’t too hot or too cold.

05

Kitchens & Washrooms

Staff kitchens and washrooms rebuilt with durable finishes and accessible layouts that meet the Manitoba Building Code.

06

Finishes & Millwork

Flooring, paint, reception desks and built-in storage that carry your brand and stand up to daily office use.

Types of Office Renovations

From a light refresh to a full fit-up of a new unit.

01

Tenant Fit-Up

Turning a bare or previous-tenant unit into your office, usually against a fixed move-in date in your lease.

02

Office Refresh

New flooring, paint, lighting and finishes in the layout you already have, with much of the work possible after hours.

03

Layout Reconfiguration

Moving walls to trade private offices for open space, or the reverse, and adding meeting rooms or quiet rooms.

04

Office Expansion

Taking over the next suite and joining the two, including the demising wall, doors and services between them.

05

Professional Offices

Law, accounting and consulting offices with reception, private offices, file storage and meeting rooms where conversations stay private.

06

Kitchens, Washrooms & Common Areas

Staff rooms, washrooms and shared corridors upgraded on their own or as part of a larger renovation.

Does an office renovation need a building permit?

Usually. The City of Winnipeg requires a building permit whenever work is regulated by the Winnipeg Building By-law or the Manitoba Building Code. Office alterations are filed with the City’s Commercial Alteration Design Summary (CADS), and work on structure, exits or fire safety systems generally needs an architect or engineer.

Sources: City of Winnipeg: Permits Online (verified 2026-10-13); City of Winnipeg: Commercial Alteration Design Summary (CADS) application, October 2025 (verified 2026-10-13); City of Winnipeg: Permits Online (verified 2026-10-13); City of Winnipeg: Occupancy permits (verified 2026-10-13); City of Winnipeg: Construction in your neighbourhood (verified 2026-10-13); Province of Manitoba: Manitoba Building Code updates, accessibility (verified 2026-10-13)

01

Permit Application

Commercial alterations are filed through the City’s Permits Online system with a Commercial Alteration Design Summary. The City says incomplete applications result in delays, so the details are checked before filing.

02

Demising Walls & Exits

Walls between tenants, exits and public corridors affect fire safety. The City’s CADS form says significant alterations to exits, lobbies used as exits or public corridors in Part 3 buildings need drawings sealed by an architect or engineer.

03

Occupancy Permit

A new tenant establishing a use without a valid occupancy permit, or a tenant expanding into more space, generally needs an occupancy permit before moving in. Ask your landlord what permit the unit already has.

04

Accessibility

Manitoba adopted the 2020 National Building Code on January 1, 2024, with accessibility requirements aligned with CSA B651. Entrances, washrooms and door clearances are planned into the layout from the start.

05

After-Hours Noise

Loud work within 150 m of a home is allowed 7 a.m. to 9 p.m. on weekdays and 9 a.m. to 9 p.m. on weekends and holidays. Your building may set its own work-hour rules too, so check the lease.

06

Outside Winnipeg

In Headingley, East St. Paul, West St. Paul, Oak Bluff, Selkirk or Steinbach, the permit comes from the local municipality or planning district instead, and we coordinate with them the same way.

From Lease to Move-In

A schedule built from your move-in date, and an update every week.

01

Site Visit & Scope

We walk the space with you, look at the lease dates and any drawings, and ask how your team works. The visit and the written quote are free.

02

Quote & Schedule

A written quote with a schedule built around your move-in date and your working hours, including which tasks happen after hours.

03

Permits & Build

We coordinate the permit, then build in phases so staff can keep working where possible, with loud work in the evenings and on weekends.

04

Inspections & Handover

City inspections passed, deficiencies cleared, rooms cleaned and ready for furniture, and a walkthrough with you before move-in.

Let’s talk about your office renovation

Send us the details and we’ll come to the property, look at the space with you, and give you a straight answer on what it takes.

  • Free, no-obligation visit

    We come out, measure up, and talk it through. You decide after that.

  • Reply within one business day

    Our team gets back to you by phone, text, or email — your pick.

  • Clear written quote

    One price, itemised, with nothing hiding in the small print.

  • Your details stay private

    We use them to get back to you about your project, and we never sell them.

  • Rather just call?

    431-866-5644 — Winnipeg, Manitoba

Get a Free Instant Price Guide

Our instant price guide gives starting ranges for kitchen, bathroom and basement renovations. Office Renovation projects are priced in the free written quote that follows an on-site visit.

Office Renovation FAQs

The things people ask us most before booking an office renovation.

It depends on the scope and on the permit. A refresh of finishes in the same layout moves quickly, while a full fit-up with new walls, ceilings and services takes longer and waits on the City’s plan review. You get a schedule with your written quote, built backwards from your move-in date, and an update every week.

Still thinking it over?

Grab a free quote instead — tell us roughly what you need and we’ll come back with numbers. No appointment required.