Explore service: Kitchen RenovationsWe renovate bathrooms, ensuites and powder rooms in Winnipeg and nearby communities, with the waterproofing done properly under the tile. Most bathrooms take two to three weeks from demolition to final clean.

Membrane and sloped base before a single tile goes down.
A bathroom is a small room that punishes shortcuts. Water gets into anything you skip. A failed bathroom often looks fine on the surface — the problem started behind the tile two years earlier.
So we do the boring parts properly. Backer board instead of drywall in the wet areas, a proper waterproofing membrane, a shower base sloped the way it should be, and the plumbing checked before anything gets closed up. Then we tile.
Bathrooms are also the job people live around, so we keep it tight. We protect the hallway, we clean up daily, and we don’t leave the room torn open for a month. Most Winnipeg bathrooms we do are finished in two to three weeks from demo to the last bead of silicone.
Whether it’s a full bathroom remodel or new tile and a vanity, the order is the same: waterproofing first, finishes second.
A full bathroom renovation takes the room back to the studs where needed and rebuilds it: plumbing and electrical, backer board and a waterproofing membrane, tile, vanity and fixtures, then paint and a full clean. Planning a smaller update, such as a new vanity or tub only? Tell us at the on-site visit and we’ll scope just that.
The old bath comes out, down to the studs and subfloor where needed, and everything is hauled away.
New supply and drain runs, plus the wiring for lighting, fans, and heated floors if you want them.
Backer board, membrane, and a properly sloped shower base. This is the step nobody sees and the one that decides how long the bath lasts.
Floor, walls, and shower tiled with the layout planned first so cuts land where they should — not in the middle of the wall.
Vanity, counter, sink, toilet, taps, and shower hardware set and sealed.
Trim, paint, mirrors, and accessories, then a full clean before you see it.
Bathroom projects range from a powder room refresh to a main bath or ensuite rebuilt from the studs. The type sets the trades involved and the length of the job, so it’s worth naming early. If you’re not sure, describe how the room is used and what bothers you about it now. That usually points to the right scope.
The family bathroom rebuilt from the studs: a new layout if needed, a waterproofed tub or shower, tile, vanity, lighting and ventilation.
An ensuite off the main bedroom with a larger shower, a double vanity or heated floors, laid out around the space you have and the drains already in place.
A two-piece powder room or a guest bath with a shower. Compact rooms need careful fixture placement, good lighting and a fan that actually clears the air.
A tiled walk-in shower with a sloped base, a waterproofing membrane and glass. A low or curbless entry is possible where the floor structure allows it.
We can replace a bathtub with a new one, or convert a tub alcove into a walk-in shower where the drain and the space allow. If it’s your home’s only tub, think about whether you’ll miss it.
We can add wall blocking for grab bars, a low-threshold shower, a comfort-height toilet and lever taps as part of a renovation, so the room stays easy to use as needs change.
It depends on the scope. The City of Winnipeg lists bathrooms among the home renovations that may need a building permit, and new plumbing or wiring may need separate trade permits. Cosmetic work such as painting, flooring and millwork does not. We coordinate the permits and inspections your bathroom needs with the City or your local municipality.
Outside Winnipeg? See who issues permits in each community we serve.
Sources: City of Winnipeg: Home renovations (verified 2026-10-13);
City of Winnipeg: Information Bulletin 2026-007-B, Building permit requirements for housing (verified 2026-10-13);
City of Winnipeg: Housing inspections (verified 2026-10-13);
Health Canada: Health risks of asbestos (verified 2026-10-13)
The City names bathrooms among the renovations that may need a building permit; whether yours does depends on the work. Painting, flooring and millwork, the City’s examples of cosmetic changes, do not need one.
The City’s 2026 housing bulletin says replacing batt insulation and vapour barrier in a small area of a finished level during a kitchen or bath renovation, with the stud walls staying, is like-for-like and needs no building permit.
New supply and drain lines, a relocated toilet, heated floors and a new fan circuit are trade work, and the City notes that many projects need electrical and plumbing permits separate from the building permit.
The City requires a rough-in inspection before plumbing, electrical or framing work under a permit is covered. Once it passes, the backer board and waterproofing membrane go on, then the tile.
Health Canada notes that before 1990, asbestos was mainly used for insulating buildings and homes, and lists older plaster, drywall and floor tiles among materials that may contain it. If your bathroom has original finishes, have them tested by a professional before demolition.
In a condo, ask your condominium corporation about approvals, water shut-offs and work hours before dates are set. Outside Winnipeg, permits come from your local municipality or planning district.
Short project, tight schedule, and you know the price before we start.
We come out, measure the room, look at the plumbing you’ve already got, and talk about what you want to change.
You get one written price covering labour, materials, and haul-away. If you want to swap a tile or a vanity, we re-price it before anyone orders anything.
Demo, rough-in, waterproofing, tile, then fixtures. Hallways get protected, the room gets sealed off, we sweep up every day, and you get a progress update every week.
We run the water, check every seal, and walk it with you. Anything you’re not happy with gets fixed before we call it finished.
The starting ranges our instant estimator uses begin at $16,000–$20,000 for a small bathroom of up to 50 sq ft. Your final price comes from the written quote we prepare after a free on-site visit.
BATHROOM RENOVATION COSTS IN WINNIPEGIn their own words: what it’s like working with Bridgeland Builders.
READ OUR REVIEWS ON GOOGLE“Our main bathroom hadn’t been touched since the seventies. Bridgeland stripped it out and had us back in it in under three weeks. They showed me the waterproofing before they tiled over it, which no other contractor bothered to do. Clean work and a fair price.”
Send us the details and we’ll come to the property, look at the space with you, and give you a straight answer on what it takes.
We come out, measure up, and talk it through. You decide after that.
Our team gets back to you by phone, text, or email — your pick.
One price, itemised, with nothing hiding in the small print.
We use them to get back to you about your project, and we never sell them.
431-866-5644 — Winnipeg, Manitoba
After you send the form, email them to info@bridgelandbuilders.com with your name.
Answer a few quick questions for an instant estimate: a useful starting price range for your project. This planning guide is free and does not obligate you to proceed.
The things people ask us most before booking a bathroom renovation.
MORE RENOVATION FAQSTwo to three weeks for a typical full bathroom, from demolition to the final clean. If it’s your only bathroom, tell us at the on-site visit: we plan those jobs so the toilet is back in service as early as possible, and we let you know in advance which days the water will be off.
Usually, yes. It depends on where the drains and floor joists run, and on a concrete slab it means breaking and re-pouring part of the floor. At the on-site visit we’ll tell you whether the move is a small change or a bigger one, and the written quote shows what it involves.
What changes the cost of a bathroom renovation
Either works. Most people choose from options we bring; some prefer to shop for their own. If you supply materials, have them on site before the start date so the schedule holds, and check the sizes with us first so the vanity, toilet and shower fit the plan.
Yes. A bathroom renovation is the right time to add them, since the floor is already open. The heating mat goes under the tile on its own circuit with a thermostat, and the wiring may need its own electrical permit. On a cold Winnipeg morning, a warm floor makes a real difference.
It happens, especially under older tubs and showers. We photograph it, show you, and price the repair in writing before going further. Rotten subfloor is replaced, never tiled over, because new tile on a damaged floor won’t last. Catching it during demolition is far better than finding it after.
We coordinate them. When your bathroom needs a building permit or plumbing and electrical permits, we arrange them with the City of Winnipeg or your local municipality and schedule inspections before the walls are closed. The City says the homeowner and the permit applicant share responsibility for inspections, so you’ll know what was booked and passed.
We measure the room, look at the plumbing, venting and floor, and talk about what you want to change. You then receive a free written quote listing labour, materials and what’s included, so it is easy to compare with any other company’s quote. If you later swap a tile or a vanity, we re-price it before anything is ordered.