Explore service: Office RenovationsWe’re a commercial renovation contractor for offices, stores, restaurants, cafés, bars, hotels and clinics in Winnipeg and nearby communities, with lease-date planning and after-hours work.

The schedule starts from your opening date and works backwards.
A commercial renovation rebuilds a working space, such as an office, store, restaurant, hotel or clinic, around a lease, an opening date and the hours you need to stay open. It usually covers demolition, new walls and ceilings, electrical and mechanical changes, washrooms, finishes, a City building permit and the inspections that follow.
A commercial remodel runs on a different clock than a home renovation, and we do both. Most business renovations come with a lease starting or an opening date booked, staff who need somewhere to work, and customers who’ll go elsewhere if the doors stay shut.
So we plan backwards from your date and tell you honestly at the site visit whether it’s realistic. Where it helps, we schedule work in the evenings and on weekends so you can keep trading, and phase the job so only part of the space is closed at a time. You get a progress update every week.
We work across Winnipeg and nearby communities, including Headingley, East St. Paul, West St. Paul, Oak Bluff, Selkirk and Steinbach, and we coordinate permits and inspections with the City of Winnipeg or, outside the city, the municipality, planning district or provincial office that issues them.
Scoped around your lease, your opening date, and the hours you need to keep trading.
Walking the space with you, your lease dates and your opening plan, then putting the scope in a free written quote.
Stripping out the old layout and building the new one: partitions, ceilings, storefronts, and service areas.
Lighting, power, data runs and HVAC changes to suit the new floor plan, with the trade permits that work needs.
Commercial washroom renovation, accessible entrances and clearances, built to the Manitoba Building Code and ready for inspection.
Flooring, wall finishes, millwork, and the details that carry your brand through the space.
Evening and weekend scheduling so you can keep trading through as much of the project as possible.
Each kind of space has its own page. We also quote work for property managers, developers and design professionals.
Tenant fit-ups, meeting rooms, private offices and open work areas, planned around your lease dates and your team’s hours.
Store layouts, fitting rooms, cash areas, showrooms and storefronts, built to your opening date with after-hours work where it helps.
Dining rooms, bars and back-of-house areas, scheduled around service and planned with the public health plan review in mind.
Guest rooms, corridors, lobbies and common areas, phased so the rest of the property keeps welcoming guests.
Exam rooms, dental operatories, physio clinics, reception and sterilization areas, with cleanable finishes and phasing around patients.
A commercial general contractor to run the trades, schedule, permits and inspections, building to supplied drawings.
Commercial property renovation for vacant units, tenant turnovers, washrooms and common areas, with weekly updates you can pass on to owners or your management company.
Practical improvements that get a property ready to sell, lease or occupy, scoped and quoted in writing after a free site visit.
Construction that turns your drawings and specifications into a finished space, with site conflicts raised before they become change orders.
Usually, yes. The City of Winnipeg requires a building permit whenever work is regulated by the Winnipeg Building By-law or the Manitoba Building Code, and a change of use needs one even when the work is only cosmetic. Substantial alterations and changes of use also need an occupancy permit before the space is used.
Outside Winnipeg? See who issues permits in each community we serve.
Sources: City of Winnipeg: Commercial projects (verified 2026-10-13);
City of Winnipeg: Commercial Alteration Design Summary (CADS) application, October 2025 (verified 2026-10-13);
City of Winnipeg: Permits Online (verified 2026-10-13);
City of Winnipeg: Occupancy permits (verified 2026-10-13);
City of Winnipeg: Construction in your neighbourhood (verified 2026-10-13);
Province of Manitoba: 2020 construction codes adoption (verified 2026-10-13);
Province of Manitoba: Building permits and inspections (Inspection and Technical Services) (verified 2026-10-15);
Province of Manitoba: Manitoba Building Code updates, accessibility (verified 2026-10-13)
Commercial alteration and change-of-use applications go in with the City’s Commercial Alteration Design Summary (CADS). The City says incomplete applications result in delays, so the details are checked before it’s filed.
The City’s CADS form says drawings must be sealed by an architect or engineer for any change to a building’s structural systems, and for significant changes to fire alarms, sprinklers, exits or public corridors in larger (Part 3) buildings. We build to their sealed drawings.
Turning a store into a restaurant is a change of use: it needs a building permit even with little construction, and a change of major occupancy may need an architect or engineer. Confirm the new use is allowed under zoning before you pay for plans.
Substantial alterations and changes of use need an occupancy permit before the space is used. A new tenant moving into a space with a valid occupancy permit and no alterations generally doesn’t need a new one.
Manitoba adopted the 2020 National Building Code on January 1, 2024, with updated accessibility requirements aligned with CSA B651. Accessible entrances, washrooms and clearances are planned at the layout stage, not added after.
In Winnipeg, loud work within 150 m of a home is allowed 7 a.m. to 9 p.m. on weekdays and 9 a.m. to 9 p.m. on weekends and holidays, so the loudest tasks are scheduled inside those hours.
Your lease start, any free-rent period and your opening date set the schedule, and we work back from them. No lease? The same plan works back from your reopening or turnover date.
At the free site visit we note your lease start, any free-rent period, the landlord’s approval of your plans, your opening date and the hours you can’t afford to lose.
Your written quote comes with a schedule worked back from opening day: drawings, permit review, ordering, construction, inspections and the occupancy permit. If your date isn’t realistic, we say so up front.
We coordinate the permits, then build in phases and in the evenings and on weekends where it helps, with the loudest work kept inside the City’s noise hours near homes.
Inspections passed, deficiencies cleared and the occupancy permit issued where one is needed. Stocking, staff training and opening wait for it, so it’s in the schedule from day one.
Commercial renovations are priced in a free written quote after a site visit, not from an online estimate, because the scope, permits and working hours differ from one space to the next. Our Winnipeg cost guide explains what moves the price.
RENOVATION COSTS IN WINNIPEGIn their own words: what it’s like working with Bridgeland Builders.
READ OUR REVIEWS ON GOOGLE“We had six weeks between the lease starting and our opening date, and everyone told us it was tight. Bridgeland scoped it, worked two weekends to keep us on track, and we opened on the day we’d advertised. We’ve used them for two more locations since.”
Send us the details and we’ll come to the property, look at the space with you, and give you a straight answer on what it takes.
We come out, measure up, and talk it through. You decide after that.
Our team gets back to you by phone, text, or email — your pick.
One price, itemised, with nothing hiding in the small print.
We use them to get back to you about your project, and we never sell them.
431-866-5644 — Winnipeg, Manitoba
After you send the form, email them to info@bridgelandbuilders.com with your name.
Our instant price guide gives starting ranges for kitchen, bathroom and basement renovations. Your commercial renovation is priced in the free written quote that follows an on-site visit.
The things people ask us most before booking a commercial renovation.
MORE RENOVATION FAQSYes. Evening and weekend scheduling is available for commercial work, and for stores and restaurants it’s often the plan from the start. In Winnipeg, loud work within 150 m of a home is limited to 7 a.m. to 9 p.m. on weekdays and 9 a.m. to 9 p.m. on weekends, so noisy tasks are scheduled inside those hours.
It depends on the scope and the approvals. A refresh of finishes moves faster than new walls, washrooms and services, which wait on the City’s plan review, and the occupancy permit, where one is needed, comes before you open.
Your schedule comes with the written quote, worked back from your lease and opening dates, and the fit-up guide below covers the City’s recent review times.
Office fit-up planning around your lease
Before, if you can. A site visit while you’re still deciding shows whether your layout fits the space, what the building needs and which approvals apply. That lets you ask for lease dates that leave room for permits, inspections and the occupancy permit. The visit and the written quote are free.
Yes. We coordinate building permits and inspections with the City of Winnipeg or your local municipality, and we flag anything in your space that will need attention early, such as a change of use, a fire separation or an accessibility upgrade. If the City requires an architect’s or engineer’s drawings, we build to theirs.
A tenant improvement, also called a fit-up, fit-out or leasehold improvement, is the work that turns a leased commercial unit into a space one business can use: walls, ceilings, lighting, washrooms, finishes and services. Your lease usually says who pays for what, so bring it to the site visit and we’ll scope the work against it.
Yes. We build to supplied drawings and specifications, and we walk the space against them before work starts. If something on the drawings won’t work on site, such as a duct that clashes with a beam, we raise it with you and your designer before it turns into a costly change.
Yes. We quote vacant-unit turnovers, common areas, washrooms and multi-unit upgrades for property managers and building owners. Each job starts with a free site visit and a written quote, and the weekly progress update gives you something to pass on to owners and tenants.
The schedule comes with your written quote, and we build to it. If something outside our control moves, like a permit review, a supplier delay or an inspection date, you hear about it in that week’s update along with what we’re doing about it, rather than at the end of the job.
Commercial work similar to yours, a written scope and price after a site visit, and a schedule built around your dates and trading hours. Ask each company how after-hours work, permits, inspections and progress updates are handled, and compare quotes for the same scope.
How to choose a renovation contractor
We work in Winnipeg and nearby communities within about an hour of the city, including Headingley, East St. Paul, West St. Paul, Oak Bluff, Selkirk and Steinbach.
Outside Winnipeg, the Province says building, plumbing and occupancy permits are issued by one of three authorities: the municipality, a planning district or the Province’s Inspection and Technical Services, depending on the location and whether the building falls under Part 3 or Part 9 of the Manitoba Building Code. We coordinate with whichever one applies.
The Province also requires an occupancy permit before a renovated building is occupied where a building permit was issued; one- and two-family dwellings are the exception.