A basement suite can house a family member or bring in rent, but Winnipeg treats it differently from an ordinary finished basement. A suite is a separate dwelling unit, so it needs zoning approval, a smoke-separated layout and its own access to services. This guide follows the City of Winnipeg’s secondary suites page and bulletins as they read on October 13, 2026. The Zoning By-law was amended in 2024 and again in June 2025, so confirm the rules for your address with the City before you design.
What counts as a secondary suite in Winnipeg?
The City describes a secondary suite as living space attached to a single-family home or located on its property, with basic living, sleeping, cooking and sanitary facilities. An attached suite is created within or added to the house and has a separate entrance; a detached suite stands alone or sits over or attached to a detached garage.
For basements, the line usually comes down to cooking. The City’s basement permit form says that if kitchen or cooking equipment will be installed, a development permit for a secondary suite may be required. If a downstairs kitchen is part of the plan, raise it with a Zoning Development Officer (Permits Direct Line, 204-986-5140) before the layout is drawn.
Which permits does a secondary suite need?
Both a development permit and a building permit, before construction starts, plus separate electrical and plumbing permits. The City offers concurrent review, where the building permit application goes in once the development application is confirmed complete, or sequential review, after development approval. Apply through Permits Online or at the Zoning & Permits office, Unit 31-30 Fort Street.
A detached suite that doesn’t meet the zoning standards may also need a conditional use application. The basement rules still apply to an attached suite, too: bedroom windows, ceiling heights, alarms and insulation are covered in our guide to basement development permits.
What does the City list for attached (basement) suites?
The City’s secondary suites page sets out the number of suites, size limits, zoning districts, parking and uses for attached suites. That’s the zoning side of the approval; the building code side, covered next, deals with smoke separation and access to services. Because the Zoning By-law changed recently, confirm each item for your lot.
| Item | What the City lists |
|---|---|
| Number of suites | One attached or detached suite per single-family property |
| Maximum size | 33% of the combined floor area of the house and suite, or 74 m² (800 sq. ft.), whichever is less |
| Minimum size | 32.5 m² (350 sq. ft.) |
| Zoning districts | A, RR5, RR2, R1, R2, RMF, RMU and C1 |
| Parking | A minimum of two off-street parking spaces |
| Uses not allowed | Home-based business, care home or neighbourhood rehabilitation facility |
| Ownership | Neither unit can be strata-titled or subdivided; both stay on one title |
Sources: City of Winnipeg secondary suites page and Information Bulletin 2021-006-B, checked October 13, 2026. The Zoning By-law and the City’s staff govern for your property.
The size cap catches people out. If the house and the suite together total 2,000 sq. ft., 33% is about 660 sq. ft., so the suite may not be able to take the whole basement. Where the suite stops, the rest of the lower level stays with the main house or becomes common space.
What does the building code require for a basement suite?
The City’s bulletin on attached suites says the suite must be self-contained and suitably separated. That means a smoke separation between the suite, the main house and any common spaces, and each household being able to reach its own services, such as breakers and mechanical equipment, without going through the other unit.
- Smoke separation: walls between units need at least ½-inch drywall on both sides, taped and sealed at joints and penetrations, with ½-inch drywall on the ceiling below the main floor. Doors in the separation are at least 1¾-inch solid-core wood with a self-closer.
- Common spaces, such as shared laundry, storage or stairs, must be reachable from both units through common areas, never only through one suite.
- A shared service room, for example one water heater serving both units or one panel feeding both, needs a smoke separation, a sound transmission (STC) rating and access from a common area.
- Where a suite separation needs a sound rating, the acoustic insulation and resilient channel are inspected with the insulation and vapour barrier.
That bulletin dates from December 2021, and Manitoba moved to the 2020 national model codes on January 1, 2024, so have the City’s plan examiners confirm current requirements for your drawings.
What changed with Winnipeg’s 2025 zoning amendments?
City Council gave the infill housing amendments second and third reading on June 26, 2025, and they’re in effect. They allow two-, three- and four-unit homes as of right in many neighbourhoods, and four-unit homes up to 39 feet tall on certain lots within 800 metres of a frequent transit route. Height, setback and landscaping rules still apply.
For a homeowner, that means a suite isn’t the only way to add a unit. Converting a house into a duplex or triplex is a different approval from a secondary suite, so ask the City which route fits your lot before you commit to a layout. Our guide to home additions and zoning covers the zoning questions behind building out.
What about detached garden or garage suites?
The City lists a minimum lot size of 325 m² (3,500 sq. ft.), a floor area between 32.5 m² and 55.7 m² (350 to 600 sq. ft.), and a height limit of 4.57 m (15 ft.) on grade or 7.62 m (25 ft.) above a detached garage. Detached suites are permitted only in R1 and R2 zones.
The suite has to sit in the rear yard, at least 3.05 m (10 ft.) from the house, and can’t be subdivided from the main building. Water and sewer servicing needs a site servicing plan prepared by a Manitoba land surveyor or professional civil engineer, so budget time for that design work.
Are there any granny suite grants available in Manitoba?
Not in the way many websites suggest. The federal Canada Secondary Suite Loan Program was never launched, and Budget 2025 confirmed it will not be implemented. What does exist is federal: insured mortgage refinancing for adding suites, and the Multigenerational Home Renovation Tax Credit when the suite lets a senior or an adult with a disability live with a relative.
| Program | Status | Key terms |
|---|---|---|
| Canada Secondary Suite Loan Program | Not available | Budget 2025: not operational and will not be implemented |
| Insured mortgage refinancing for secondary suites | In effect for applications from January 15, 2025 | Up to 90% of the as-improved value (under $2 million), up to 30-year amortization, up to four units in total; new units must be self-contained, meet municipal zoning and not be short-term rentals |
| Multigenerational Home Renovation Tax Credit (federal) | Available (2025 tax year figures) | 14.5% of up to $50,000 in eligible costs, to a maximum of $7,250, for a self-contained unit that lets a senior or an adult eligible for the disability tax credit live with a qualifying relative |
Checked October 13, 2026 against Budget 2025, Department of Finance Canada and Canada Revenue Agency pages.
For anything provincial or municipal, check with Manitoba Housing and your municipality before you count on a grant, and talk to your lender and tax professional before relying on either federal option. Our guides to Manitoba renovation tax credits and rebates and home renovation financing in Canada go further.
Next step
Every suite starts as a basement, so the first questions are the same: is it dry, is the ceiling high enough, and can the windows work for bedrooms? Our basement suite and basement renovation projects begin with a free on-site visit and a free written quote, with permits and inspections coordinated with the City. Get a starting range from the instant estimate, or book your visit.
Frequently Asked Questions
No. The City’s secondary suites page allows only one secondary suite, attached or detached, per single-family property. If you want more units than that, the June 2025 zoning amendments allow two-, three- and four-unit homes as of right on many lots, but that is a different approval with its own requirements.
Yes. The City describes an attached secondary suite as a self-contained unit with a separate entrance, and its bulletin requires each household to reach its own services and any shared spaces without passing through the other unit. Plan the entrance and stairs first, because they shape the rest of the floor plan.
The City’s page caps an attached suite at 33% of the combined floor area of the house and suite, or 74 m² (800 sq. ft.), whichever is less, with a minimum of 32.5 m² (350 sq. ft.). If the house and suite total 2,000 sq. ft., the suite tops out at about 660 sq. ft. Confirm current limits with the City.
No. It was announced in 2024 but never launched, and Budget 2025 says it will not be implemented because it had a large potential to overlap with the insured mortgage rule changes announced in January 2025. If you’re adding a suite, ask your lender about insured refinancing of up to 90% of the home’s value after the suite is built.
Often, for parts of it. The City asks for engineer-stamped drawings when a window is added or enlarged in a foundation wall, and for engineered drawings when major structural work, such as changing beams or teleposts, is involved. A detached suite’s water and sewer plan must come from a Manitoba land surveyor or professional civil engineer.
Sources
- City of Winnipeg – Secondary suites (verified )
- City of Winnipeg – Information Bulletin 2021-006-B: Containment & separation for attached secondary suite design (verified )
- City of Winnipeg – Building permit application form: basement/lower level development (updated October 2025) (verified )
- City of Winnipeg – Information Bulletin 2026-008-B: Vapour barrier & insulation in housing inspections (verified )
- City of Winnipeg – Zoning changes to accommodate infill housing (verified )
- Province of Manitoba – Adoption of the 2020 national model construction codes (verified )
- Government of Canada – Budget 2025, Annex 3: Comprehensive Expenditure Review (verified )
- Department of Finance Canada – Mortgage insurance rule changes to enable homeowners to add secondary suites (verified )
- Canada Revenue Agency – Multigenerational home renovation tax credit (line 45355) (verified )
Planning a project like this in Winnipeg?
Tell us what you have in mind and we will put together a clear, written quote.