Permits are the part of a renovation most people would rather skip, but in Winnipeg they’re also how the work gets checked by an inspector before it disappears behind drywall.
This guide sorts common home projects into what needs a permit and what doesn’t, using the City of Winnipeg’s own pages, checked on October 13, 2026. Rules change, so treat it as a starting point and confirm your project with the City’s Permits Direct Line at 204-986-5140.
Which renovations need a building permit in Winnipeg?
The City’s home renovations page lists kitchens, bathrooms, adding or converting rooms to bedrooms, creating open-concept living space, and new or larger exterior door or window openings as work that may need a building permit under the Winnipeg Building By-law.
Since February 2026, the By-law requires one to create a new bedroom or finish a previously undeveloped level. Basements, additions, higher decks, larger sheds and garages, and secondary suites need one too.
| Project | Building permit? | Also check |
|---|---|---|
| Painting, flooring, cabinets, shelves, millwork | No | Building code and zoning still apply |
| Replacing doors and windows with the same size | No | Same size only; see window and door replacement in Winnipeg |
| New or larger exterior door or window opening | Yes | A development permit may apply; new or enlarged openings in a foundation wall need engineer-stamped drawings |
| Kitchen or bathroom renovation | Often; the City lists both | Plumbing and electrical permits for any changes to those systems |
| Removing walls for an open-concept layout | Yes | Expect structural drawings if load-bearing walls, beams or joists change |
| Finishing a basement (rooms, bedrooms, living space) | Yes | See basement development permits |
| Secondary suite | Yes | Development permit, plus electrical and plumbing permits |
| Addition or attached garage | Yes | Development permit and zoning; see home additions and zoning |
| Deck more than 600 mm (2 ft.) above ground and over 3.4 m² (36 sq. ft.) | Yes | Open decks under 600 mm don’t need a permit |
| Detached shed, garage or other accessory structure over 10 m² (108 sq. ft.) | Yes | Separate electrical permit for detached garages and carports |
| Sump pit when adding or replacing weeping tile | Yes | Plumbing permit for the backwater valve; electrical permit for the pump’s dedicated receptacle |
| Re-shingling or re-siding with the same material | No | Code still applies |
Sources: City of Winnipeg home renovations, home improvement projects, decks and accessory structures pages, and Information Bulletin 2025-001, checked October 13, 2026.
What doesn’t need a permit?
The City lists these as projects that typically don’t need a permit: barrier-free ramps, fences on single- and two-family lots, replacing stucco, siding or shingles with the same material, small detached accessory structures, low open decks, interior finishing work, and same-size door and window replacement. Building code and zoning rules still apply.
The limits matter. Detached accessory structures have to be under 10 m² (108 sq. ft.), open decks under 600 mm (2 ft.) high, and interior work means painting, patching, decorating or installing cabinets and shelves.
Trade work has its own exemptions. In an owner-occupied single detached house, swapping a light fixture, switch or receptacle in the same location doesn’t need an electrical permit, as long as the existing copper branch circuit isn’t modified.
Repairing a leak or replacing a fixture such as a faucet or water heater in the same location doesn’t need a plumbing permit if the system itself isn’t changed. Moving or adding outlets, circuits or drains does.
Do you also need a development permit?
Sometimes. A development permit checks zoning, such as land use and where a structure sits on the lot; a building permit checks construction against code. Secondary suites, additions and some exterior changes can need both. Confirm before you apply, because the City’s forms warn that a building permit will be refused if a development permit was needed.
If the project involves a basement or lower-level suite, the rules are stricter than for a rec room. Our guide to secondary suite rules in Winnipeg covers what the City asks for.
How do I apply for a development permit in Winnipeg?
Confirm whether you need one, then apply through Permits Online. Since October 2025 the City reviews development and building permit applications at the same time for projects that need both (concurrent review); you can still wait for development approval before applying for the building permit (sequential review). The building permit must match the development approval.
- Ask the City whether your project needs a development permit: call Permits Direct Line at 204-986-5140 or email ppd-zdo@winnipeg.ca to reach a Zoning Development Officer.
- Prepare the development permit application and the City’s checklist for your type of building; there is one for single- and two-family residential properties.
- Submit it through Permits Online, or drop it off at the Zoning & Permits office, Unit 31-30 Fort Street, weekdays 8:30 a.m. to 4:30 p.m.
- Choose concurrent or sequential review when you apply for the building permit.
- If your project is exempt, include the City’s declaration form for development permit exemption with the building permit application.
Who takes out the permit: you or your contractor?
The City says homeowners are responsible for getting permits before a project starts, and that if you hire a contractor, you should make sure the permit is in place before work begins. In other words, the responsibility stays with you even when someone else fills in the forms, so ask to see the permit.
Trade permits have their own rules. Electrical and plumbing permits go to licensed contractors, or to a homeowner who does the work personally in the single detached house that is their primary residence. Homeowners can’t take out electrical permits for some work, including electrical services, work over 200 amps, generators and EV chargers.
On our projects, permits and inspections are coordinated with the City of Winnipeg or the local municipality, and your written quote spells out what’s included. Whoever you hire, ask the same question before you sign.
How long does a Winnipeg permit take?
In September 2026, the City of Winnipeg took an average of 8.4 business days to review housing permit applications for new construction, additions and alterations, against the City’s own target of 10 business days.
Housing permits where one dwelling is stacked above another, such as a house over a basement suite, averaged 13 business days that month, against a target of 15.
That’s review time, the time the City takes to reach a decision on an application, not the total time until a permit is issued. The City separately tracks how long it takes to confirm that an application is complete, and incomplete applications are delayed, so complete, dimensioned drawings are the part of the timeline you control.
What inspections should you expect?
Permitted work is inspected before it’s covered. Request inspections through the City’s housing inspection request form at winnipeg.ca/housinginspection, or by phone at 204-986-5300 on weekdays. Insulated walls and ceilings get a rough-in inspection and then a preboard inspection of insulation and vapour barrier before drywall. Wiring and plumbing are inspected before they’re covered too.
Timing matters as well. The City’s housing inspections page, verified October 15, 2026, says a defect an inspector finds must be corrected and re-inspected within one month or a fee applies, and a permit isn’t closed until the work has passed every required inspection. The FAQ below covers how long a permit stays valid.
What happens if you renovate without a permit?
The City’s Permit Amnesty page says renovations done without permits must be brought up to current codes through permits and inspections, and that undeclared work can lead to notices or orders, with fines or penalties.
Post-construction penalty fees are waived only where amnesty is approved, and amnesty covers a homeowner’s primary residence, not rental properties. Our guide to checking a Winnipeg home’s permit history covers open permits, unpermitted work and how Permit Amnesty applies.
In practice, a missing permit can mean opening finished walls so an inspector can see what’s inside, adding cost and delay at the end of a project.
Which building code applies in Manitoba?
Manitoba adopted the 2020 editions of the national model building, plumbing, energy and fire codes effective January 1, 2024. Building and plumbing permits approved from that date are reviewed against the 2020 codes, while inspections on permits approved earlier check the plans approved under the previous codes.
Renovating outside Winnipeg?
Permits come from the municipality where the house is. Around Winnipeg, that means the RM of Headingley; the Red River Planning District for East St. Paul and West St. Paul; the RM of Macdonald for Oak Bluff; and the cities of Selkirk and Steinbach. Requirements and forms differ, so confirm the permit office and its process before you finalize drawings.
Next step
Permit questions are easier to answer with the space in front of you, whether you’re planning a kitchen remodel, a bathroom renovation or an addition. Every project starts with a free on-site visit and a free written quote, so book your visit, or get a starting range first with our instant estimate. For budgets, see typical Winnipeg price ranges.
Frequently Asked Questions
A detached accessory structure, such as a shed, of 10 m² (108 sq. ft.) or less doesn’t need a building permit in Winnipeg; the City requires one above that size. Smaller structures still have to meet zoning rules such as setbacks, and electrical work in them needs its own permit. Outside Winnipeg, check with your municipality.
Not if the new windows and doors are the same size as the old ones; the City lists same-size replacement as work that typically doesn’t need a permit. Making an opening larger, or cutting a new one, needs a building permit, and a new or enlarged opening in a foundation wall needs drawings stamped by an engineer.
It depends on the scope. The City lists kitchens and bathrooms among renovations that may need a building permit, and altering plumbing or adding circuits needs plumbing or electrical permits. Swapping a faucet or fixture in the same spot, or replacing cabinets and counters without plumbing or wiring changes, is much closer to the work the City exempts.
Yes. The City makes homeowners responsible for permits, and you can apply through Permits Online or at the Zoning & Permits office at Unit 31-30 Fort Street. Electrical and plumbing permits are narrower: a homeowner can take them out only for work they do personally in the single detached house that is their primary residence.
The City says a permit expires if work hasn’t started within six months of issue, and charges a fee unless you confirm the start, book an inspection or request an extension before then. A permit not closed by a final inspection within three years is charged a non-compliance fee. Extensions may be requested but aren’t guaranteed.
Permit fees are set by the City’s fees and charges schedule and vary with the permit type and project. On the basement permit form, the declared construction value is used for statistics and doesn’t affect the permit cost. When you compare written quotes, check whether permit fees are included so you’re comparing the same scope.
Sources
- City of Winnipeg – Home renovations (verified )
- City of Winnipeg – Home improvement projects (projects that need, and don’t need, a permit) (verified )
- City of Winnipeg – Detached garages & accessory structures (verified )
- City of Winnipeg – Decks (verified )
- City of Winnipeg – Electrical installations (verified )
- City of Winnipeg – Plumbing installations (verified )
- City of Winnipeg – Building permit application form: basement/lower level development (updated October 2025) (verified )
- City of Winnipeg – Information Bulletin 2025-001: Sump pit installations for housing (verified )
- City of Winnipeg – Information Bulletin 2026-008-B: Vapour barrier & insulation in housing inspections (verified )
- City of Winnipeg – City rolls out improvements to its permit services (October 30, 2025) (verified )
- City of Winnipeg – Building permit application processing times (verified )
- City of Winnipeg Open Data – Building permit application processing times (review) (verified )
- City of Winnipeg – Permits Online (verified )
- Province of Manitoba – Adoption of the 2020 national model construction codes (verified )
- Red River Planning District (verified )
- City of Winnipeg – Housing inspections (permit expiry, defects and closing) (verified )
- City of Winnipeg – Permit Amnesty program (verified )
- City of Winnipeg – Information Bulletin 2026-007-B: Building permit requirements for housing (verified )